Feng, K (2020) Environmentally friendly construction processes under uncertainty assessment, optimisation and robust decision-making, Unpublished PhD Thesis, , Luleå University of Technology.

Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client, Unpublished PhD Thesis, , Luleå University of Technology.

Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations, Unpublished PhD Thesis, , Luleå University of Technology.

  • Type: Thesis
  • Keywords: carbon emissions; construction project; duration; earthmoving; earthworks; energy consumption; environmental impact; monitoring; artificial neural network; infrastructure project; project planning; stakeholders; economic impact; optimization; case studies
  • ISBN/ISSN:
  • URL: http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-74574
  • Abstract:

    Road and infrastructure projects have significant environmental impacts due to their high energy consumption and CO2 emissions. Among it, earthmoving operations contribute disproportionately to these impacts because of their intensive use of heavy machinery. However, little is known about how different equipment configurations and/or operational management strategies affect the environmental impact of earthmoving operations. Specifically, there is a lack of tools that enables stakeholders to understand and assess environment impacts of per unit volume of earth handled, a lack of integrated method taking into account both environmental and economic impacts in the planning of earthmoving operations. This work aims to facilitate the adoption of sustainable earthmoving practices in construction by providing methods for selecting environmentally costeffective equipment configurations for earthmoving operations. Based on these considerations, three research questions were formulated: How can planners and construction managers of earthmoving projects estimate the energy use and carbon emissions of earthmoving machines per functional unit of material handled? Which factors relating to earthworks operations have the greatest impact on energy use and carbon emissions? How can stakeholders optimize equipment configurations with respect to the trade-off between the carbon emissions, time, and cost of earthwork operations? To answer these questions, an exploratory research approach involving multiple case studies was adopted. This resulted in the generation of a large body of experimental data and made it possible to test new methods for predicting and minimizing emissions due to earthmoving operations during the planning phases of construction projects. Throughout, the work was guided by the results of comprehensive literature reviews. Key findings of the work presented here include: The combination of Discrete Event Simulations (DES) and mass haul optimization (MHO) can be used to assess environmental impacts during project planning stage. Artificial Neural Networks (ANNs) provides an effective approach to model the relationships between input variables relating to the earthmoving equipment and project conditions and output variables relating to energy use and CO2 emissions per unit volume of hauled materials, The environmental performance of an item of equipment during earthmoving operations can be expressed as a function of the equipments operational characteristics and the job-site conditions such as digging depth, density of hauled materials and/or the topography of haulage surface. These factors all have important effects on the environmental impacts of earthmoving operations and the efficiency of the work, As expected, improving equipment utilization rates and/or cycle times significantly reduces energy use and CO2 emissions per unit volume of material handled. This also increases the equipments usage efficiency in terms of fuel consumption per unit volume of material hauled. A high usage efficiency (evaluated in terms of utilization rates and/or cycle times) thus minimizes both the emissions and the costs of earthmoving operations. Planning tools that account for costs and durations when assessing the carbon emissions of earthmoving operations make it possible to select optimal earthmoving equipment configurations that minimize emissions and costs (or at least do not increases costs). In summary, this thesis identifies key factors that facilitate the assessment and reduction of energy consumption and carbon emissions in earthmoving projects. The developed approaches allow construction managers to benchmark the emissions of different equipment configurations during project planning. The most important outcome of this work is the development of new methods for assessing energy use and CO2 emissions per unit volume of materials handled based on equipment characteristics and project conditions. These methods can be used to compare equipment configurations during the early stages of projects, and also for bench arking/monitoring purposes during the construction stage. In particular, their use in the planning stages could help planners and construction managers to identify optimal equipment configurations that will minimize the environmental and economic impacts simultaneously.

Jongeling, R (2006) A process model for work-flow management in construction, Unpublished PhD Thesis, , Luleå University of Technology.

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures, Unpublished PhD Thesis, , Luleå University of Technology.

Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture, Unpublished PhD Thesis, , Luleå University of Technology.

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies, Unpublished PhD Thesis, , Luleå University of Technology.

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes, Unpublished PhD Thesis, , Luleå University of Technology.

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication, Unpublished PhD Thesis, , Luleå University of Technology.

Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects, Unpublished PhD Thesis, , Luleå University of Technology.

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods, Unpublished PhD Thesis, , Luleå University of Technology.

Schade, J (2013) A design process perspective on the energy performance of buildings, Unpublished PhD Thesis, , Luleå University of Technology.

Simu, K (2009) The construction site manager's impact on risk management performance, Unpublished PhD Thesis, , Luleå University of Technology.

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost, Unpublished PhD Thesis, , Luleå University of Technology.

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking, Unpublished PhD Thesis, , Luleå University of Technology.

Vennström, A (2008) The construction client as a change agent contextual support and obstacles, Unpublished PhD Thesis, , Luleå University of Technology.

Wernicke, B (2020) Diversity of flow in production improvements in house building, Unpublished PhD Thesis, , Luleå University of Technology.

Woksepp, S (2007) Virtual reality in construction tools, methods and processes, Unpublished PhD Thesis, , Luleå University of Technology.